The crate is too large to deliver assembled
Large crates can be difficult to transport or fit through doors. We can bring the components and build the crate at your facility, where there is enough working space.
Custom industrial packaging
Crates built and packed on site.
Vol Case brings crate components, tools and a crew to your facility to pack machinery and oversized equipment. We are based in Oak Ridge, Tennessee. Tell us your location, what needs packing and when, so we can confirm availability and the work we can provide.
Free design & quoting. No obligation.
We check the space around the machinery and the route to the shipping area before arranging the visit.
We prepare crate components in our shop where possible, then assemble the crate and pack the equipment at your facility.
Before the visit, we confirm who will prepare, disconnect, lift and transport the equipment, and what our crating crew will do.
When to use on-site crating
Large crates can be difficult to transport or fit through doors. We can bring the components and build the crate at your facility, where there is enough working space.
Waterproof barrier bagging takes special tools and skills. Our crew can carry out this packing work around the equipment at your facility.
For a production-line move, machines may become available on different dates. We plan where and when to pack each one and how the finished crates will reach the pickup area.
Work at your location
Before we pack the equipment, we will agree on the crate design, supports and packing materials. We also confirm the work area and who will prepare, disconnect, move and transport the machinery, as those jobs are arranged separately from crating.
We complete as much of the work as possible in our shop such as cutting lumber and plywood and assembling smaller components. This helps speed up the processes at your facilities.
Our crew assembles the crate and packs the equipment. The agreed work can include supports, blocking and restraints to hold it in place, plus barrier materials to protect it.
We work with local millwright partners when needed to move machinery. Before the visit, we agree who will do that work, what lifting equipment is needed and when it will happen.

How the work happens
We plan each visit around when the equipment is ready, where the crew can work and how the machinery will be moved.
Send the facility address, equipment list, dimensions, weight and photos or drawings. We will check whether we also need to visit before quoting.
Review the crate design and packing materials with us. Determine the work area, access, who moves the equipment and the order of work, then approve the quote.
We prepare the crate components and materials. We arrange arrival for when the equipment, work area and people moving the machinery are ready.
Our crew builds the crate and packs the prepared equipment. If the equipment, access or work changes, we agree what to do before continuing the affected work.
We check the finished packing against the agreed work, including any labels and documents needed. We then coordinate with the people responsible for moving or transporting the crate.

Information for your quote
Send these details so we can plan the work and quote the visit.
Use general, non-sensitive information for the initial inquiry. Arrange an approved transfer method before sharing controlled technical files.
Packing requirements
Blocking, bracing and restraints hold the equipment in place. We use strong points that can carry the load and keep pressure away from fragile areas.
We can add foam at contact points or on delicate surface finishes. Waterproof barrier bagging is available with desiccant to absorb moisture. The choice depends on the equipment and how it will be transported.
Send the destination and shipping requirements early. We address wood treatment and official markings where required. Equipment documents and other shipping requirements must be checked separately.
Project example
Vol Case coordinated with millwrights and the trucking company for a manufacturing equipment shipment to Europe. Most of the crating work took place outside the facility to keep wood dust out of the building, making the work area and weather part of the planning.

Frequently asked questions
Tell us where the equipment is and what needs packing.
We are based in Oak Ridge, Tennessee. Send your city, ZIP code, equipment details and proposed dates. We will check travel, access and the work needed, then confirm whether we can take on the job.
Tell us about your project
Tell us what you need to pack, how it will travel and when you need it. We can help you choose a case, foam insert or wood crate.